Our Architectural Consultancy, Scope of Services at Various stages are as follows:

SCHEMATIC DESIGN

Develop scheme design from approved outline taking into consideration all Client's requirements, statutory and regulatory requirements and other Consultants.

Liaise with other Consultants.

Advise Client of consequences of design, any subsequent changes, alternatives and materials on both cost and timetable of project.

Prepare updated cost estimates.

Ongoing advice in relation to materials, building methods, 'constructability' and availability.

Ongoing advice in relation to furniture, fittings and fixtures including costing, lead times for manufacture, etc.

Advise Client on need and cost for design prototypes, special displays, models.

Present the design to the Client and obtain approval from Client for design and authority to proceed to the next stage.

DESIGN DEVELOPMENT

Develop drawings for approval from relevant Authority and Utility providers.

Develop detail design documents and specifications including coordination of Consultants.

Advise Client on methods of construction, material quality and revisions of cost and timetable estimates.

Make all necessary applications to regulatory authorities and utility providers necessary for the project.

Obtain Client's approval to detailed design and authority to proceed to next stage.

We will be offering the following consultancy services:

· Formulation of requirements.
· Preparation of Concept drawings.
· Preparation of sketch scheme 1 drawings.
· Preparation of sketch scheme Revision 2 drawings.
· Preparation of detailed drawings set 1.
· Preparation of architectural detailed drawings (Revision) Set 2
· Preparation of CMDA Working drawings.
· Issue of Foundation structural drawings.
· Issue of Ground Floor Lintel
· Issue of Ground Floor roof.
· Issue of Ground Floor Brick Work
· Issue of First Floor Lintel.
· Issue of First Floor Roof
· Issue of First Floor Brick Work
· Issue of Second Floor Lintel
· Issue of Second Floor Roof
· Issue of Second Floor Brick Work
· Issue of Third Floor Lintel
· Issue of Third Floor Roof
· Issue of Third Floor Brick Work
· Issue of North side Elevation
· Issue of East side Elevation
· Issue of West side Elevation
· Issue of South side Elevation
· Issue of Schedule of joinery – Ground floor
· Issue of Schedule of joinery – First floor
· Issue of Schedule of Joinery – Second Floor
· Issue of Schedule of Joinery – Third floor
· Issue of Ground Floor Plan indicating joinery notation
· Issue of First Floor Plan indicating joinery notation
· Issue of Second Floor Plan indicating joinery notation
· Issue of Third Floor Plan indicating joinery notation
· Issue of East Elevation – Revision
· Issue of North Elevation – Revision
· Issue of South Elevation – Revision
· Issue of West side part plan – Revision
· Issue of Lift / Staircase lobby – Flooring detail
· Issue of Cross Sections
· Issue of Second Floor / Third Floor - North side
· Issue of Water tank Architectural plan
· Issue of Water Tank Structural plan
· Issue of Ground Floor Marble Layout
· Issue of Site plan showing Service line detail
· Issue of Meter room / Generator pedestal detail
· Issue of Staircase Handrail detail
· Issue of Ground Floor Level plan showing water supply detail
· Issue of Ground Floor Level Plan showing SanitaryLine detail
· Issue of First Floor Level plan showing water supply
· Issue of First Floor Level plan showing Sanitary Line detail
· Issue of Second floor Level plan showing Water supply
· Issue of Second floor Level plan showing Sanitary detail
· Issue of Underground Sump Detail. Architectural / Structural
· Issue of Colour Scheme
· Issue of Compound Wall drawings
· Issue of Gate drawings.
· Issue of compound wall structural drawing

Tuesday, September 23, 2008

scope/services of our office


SCHEDULE OF ARCHITECTURAL CONSULTANCY SERVICE - STAGES

Stage I :
Requirement formulation conceptual sketches, site planning, detailed discussions with the client, measured drawings of the site and existing structures, sketch scheme drawings.

Stage I I :
Detailed scheme drawing preparation (to assist the Corporation Liaison to prepare the Corporation drawing for submission for Corporation approval)

Stage I I I :
Presentation drawings & working drawings, Preparation of Ground floor, first floor, Second floor (if any), sections and elevations.

Stage I V : Construction Drawings.
Plan showing column sizes, brick walls, doors and windows start the construction at site.

I) Foundation drawing
ii) Footing details
iii Central line drawing
iv) Plinth beam details
v) Brick work details
vi) Staircase details
vii)Specifications
viii)Sections.

Stage V :
Ground floor lintels detail, window openings, sunshades, sill plate details, Ground floor roof slab, sunken portions, Electrical drawings.

Stage VI :
Brick work details for the first floor, window openings and sunshades lintel details, first floor roof details with sunken portions, Electrical and plumbing drawings.

Stage VI I :
Details regarding parapet wall, Following floor rooms, wash area details, second floor roof details etc., Elevation drawings with color scheme.

Stage VI I I:
Plumbing works, electrical works, plastering works - inside and outside, fixing of windows, ventilators and doors, plastering bands and grooves, handrails, entrance step details, lobby details, sample coloring, final coloring etc.,

L I S T O F D R A W I N G S


Preliminary drawings prepared in the pre-construction stage , for discussion , approval from clients etc .,
· Sketch scheme drawings set
· Detailed scheme drawings set
· Presentation drawings set

Working drawings prepared in the construction stage for issue site , clients etc.,

Architectural drawings
a) Ground floor plan
b) First floor plan

Architectural drawings
a) Sections - Longitudinal & cross
b) Elevations - All four sides
c) Terrace floor plan and Headroom and water tank
details
d) Wall sections
e) Staircase details

Structural drawings
a)Ground floor lintel
b)Ground floor roof and beams
c)First floor lintel
d)First floor roof and beams

Electrical drawings
a) Ground floor electrical conduit layout
b) First floor electrical conduit layout
c) Terrace floor / Staircase headroom electrical
Conduit layout

Architectural drawings
a)Joinery schedule
b) Grill details
c) Staircase & Balcony handrail details
d)Kitchen and pantry details
e)Toilet details (all)
f) Elevation - Plaster groove and band details and painting details

Structural drawings
a)Details of headroom slab and beams
b) Water tank details

Plumbing drawings
a)Toilet details
b)Terrace floor roof drawings
c)Service lines from water tank

Architectural drawings
a) Site plan
b)Compound wall and gate details
c) Sump details (if any)

Structural drawings
a)Foundation for compound wall and gate
b) Sump details ( if any)

Plumbing drawings
a) Site plan indicating service lines
b) Inspection chamber details.

Sunday, September 21, 2008

mrs geetha and mr d .murali s residence in half a ground plot









THIS IS A RESIDENCE DONE FOR A WONDERFUL COUPLE,MRS GEETHA AND D.MURALI,IN AN HALF GROUND PLOT NEARER TO BEACH,KOTTIVAKKAM,THIRUVANMYUR.

THEY AND THEIR TWO CHILDREN WANTED A CONTEMPORARY HOUSE . ALL THEIR REQUIREMENTS ARE NICELY FITTED BY THE USE OF VARIOUS LEVELS

interesting room with in a room , a new attempt has been tried to create spaces for two people to live in a single large space but a t the same time have their privacy,different lighting conditions,etc





Sunday, September 7, 2008

mrs &dr hari haran s residence at adyar




clinic and residence in a  tight residential property in adyar.
the concept is to provide comfortable living for the elderly parents andyounger  brother in the ground floor , dr hari s in the mezzanine and first floor.... his consultation clinic in the basement
a small court links all these three levels..vertical two storey and three storey spaces are used to bring the family together
a receive ,raised lawn,a gate way   and stone steps lead one to the entry of the house