Our Architectural Consultancy, Scope of Services at Various stages are as follows:

SCHEMATIC DESIGN

Develop scheme design from approved outline taking into consideration all Client's requirements, statutory and regulatory requirements and other Consultants.

Liaise with other Consultants.

Advise Client of consequences of design, any subsequent changes, alternatives and materials on both cost and timetable of project.

Prepare updated cost estimates.

Ongoing advice in relation to materials, building methods, 'constructability' and availability.

Ongoing advice in relation to furniture, fittings and fixtures including costing, lead times for manufacture, etc.

Advise Client on need and cost for design prototypes, special displays, models.

Present the design to the Client and obtain approval from Client for design and authority to proceed to the next stage.

DESIGN DEVELOPMENT

Develop drawings for approval from relevant Authority and Utility providers.

Develop detail design documents and specifications including coordination of Consultants.

Advise Client on methods of construction, material quality and revisions of cost and timetable estimates.

Make all necessary applications to regulatory authorities and utility providers necessary for the project.

Obtain Client's approval to detailed design and authority to proceed to next stage.

We will be offering the following consultancy services:

· Formulation of requirements.
· Preparation of Concept drawings.
· Preparation of sketch scheme 1 drawings.
· Preparation of sketch scheme Revision 2 drawings.
· Preparation of detailed drawings set 1.
· Preparation of architectural detailed drawings (Revision) Set 2
· Preparation of CMDA Working drawings.
· Issue of Foundation structural drawings.
· Issue of Ground Floor Lintel
· Issue of Ground Floor roof.
· Issue of Ground Floor Brick Work
· Issue of First Floor Lintel.
· Issue of First Floor Roof
· Issue of First Floor Brick Work
· Issue of Second Floor Lintel
· Issue of Second Floor Roof
· Issue of Second Floor Brick Work
· Issue of Third Floor Lintel
· Issue of Third Floor Roof
· Issue of Third Floor Brick Work
· Issue of North side Elevation
· Issue of East side Elevation
· Issue of West side Elevation
· Issue of South side Elevation
· Issue of Schedule of joinery – Ground floor
· Issue of Schedule of joinery – First floor
· Issue of Schedule of Joinery – Second Floor
· Issue of Schedule of Joinery – Third floor
· Issue of Ground Floor Plan indicating joinery notation
· Issue of First Floor Plan indicating joinery notation
· Issue of Second Floor Plan indicating joinery notation
· Issue of Third Floor Plan indicating joinery notation
· Issue of East Elevation – Revision
· Issue of North Elevation – Revision
· Issue of South Elevation – Revision
· Issue of West side part plan – Revision
· Issue of Lift / Staircase lobby – Flooring detail
· Issue of Cross Sections
· Issue of Second Floor / Third Floor - North side
· Issue of Water tank Architectural plan
· Issue of Water Tank Structural plan
· Issue of Ground Floor Marble Layout
· Issue of Site plan showing Service line detail
· Issue of Meter room / Generator pedestal detail
· Issue of Staircase Handrail detail
· Issue of Ground Floor Level plan showing water supply detail
· Issue of Ground Floor Level Plan showing SanitaryLine detail
· Issue of First Floor Level plan showing water supply
· Issue of First Floor Level plan showing Sanitary Line detail
· Issue of Second floor Level plan showing Water supply
· Issue of Second floor Level plan showing Sanitary detail
· Issue of Underground Sump Detail. Architectural / Structural
· Issue of Colour Scheme
· Issue of Compound Wall drawings
· Issue of Gate drawings.
· Issue of compound wall structural drawing